Architecture & interiorsCarlton North, Melbourne

Smethwick
Cottage

A home, carefully reimagined.In construction
Smethwick Cottage rear elevation, watercolour artist’s impression from the project billboard
Rear elevation · Artist’s impression from the Smethwick Cottage billboard.

If you’ve walked past the house on Canning Street recently, you may have seen that building work is well underway. This is our Smethwick Cottage renovation, a late-nineteenth-century cottage in Carlton North.

Read the project story ↓

01 / The House & Client Brief

The House & Client Brief

Understanding the existing house and what the clients want to achieve

The Canning Street terrace facade and neighbouring cottage before worksExisting front verandah
Two street-front views of the property. Photography: Daniel Yung.

There is an enduring appeal to the way these houses greet the street. A low fence contains a small garden, while the verandah gives you somewhere to sit and watch the world go by. You can wave to a neighbour or tend a few plants while feeling sheltered from the footpath. This small space between the house and the street allows privacy and participation to sit comfortably together. It is a quality I think we too often lose in contemporary housing.

Existing rear living room looking towards the courtyardExisting front bedroom
Existing photos of the living room and front bedroom.

Inside, the front rooms had plenty of character. However, the rooms at the rear were dark, and several steps down to the garden interrupted what could have been a lovely connection between inside and out.

Through our discussions with the clients, we learned how much they valued being able to host friends, as well as having space just for them. It was about being able to fling open the doors in summer and cosy up by the fire in winter. They wanted a home full of character and warmth, with rooms that reflected their gorgeous personalities.

As a long-term family home, it also needed rooms that could adapt over time. A study might become a nursery; a bedroom might later become a snug for winter. Ample, well-considered storage was also essential.

Retaining the front rooms and adding two storeys at the rear was a natural starting point. This would allow for three bedrooms and a good-sized kitchen and dining area. Beyond these obvious design moves, the challenge was to make the rooms feel generous on a narrow site while preserving the cottage’s charm as it grew.

02 / Concept design

Concept design

Exploring what’s possible on the site and presenting two initial design directions

Concept design begins with understanding what can be built on the site. We consider the neighbouring buildings, the path of the sun and opportunities for light and outdoor space. We review the planning controls, heritage requirements and building regulations.

Site diagram showing the planning constraints around the proposed building footprint
Building and planning constraints · Exploring the buildable envelope
Demolition sketch: the rear structures marked in red are distinguished from the retained front terrace.Demolition
Constraints sketch: red height and setback lines frame the proposed rear building volume behind the existing terrace.Planning and building constraints
Proposed-design sketch: a blue rear addition sits behind the retained front terrace.Proposed design
1 / 3
Early concept sketches · Demolition, constraints and proposed design

Smethwick Cottage sits on a narrow east-west site, with a shared wall to each neighbour. Gardens and openings at either end of the property offer opportunities for morning and afternoon light to enter the home. Heritage requirements meant any first-floor addition had to be set back from the street. Overshadowing requirements limited how far it could extend towards the rear. Together, these defined the space available for a new upper floor.

Design thinking

Understanding what can be built is only part of the picture. Our design framework helps us consider what should be built. We think about the past, present and future. We look at the history of the house and its surroundings. We consider the clients’ lives and values. We think about the atmosphere we want to create together.

We identify a few lines of enquiry specific to each project. These give our research focus and help us choose which ideas and references to explore. They build a foundation for the design and give us something to return to as we make decisions. For Smethwick Cottage, we explored the craftsmanship of the existing house, British cottage and terrace architecture adapted to Melbourne, and the cultural fabric of Carlton.

We explored these ideas alongside the practical requirements of the brief. From this work, we developed two design directions for the clients to review.

Both explored how to bring more light into the house, connect it to the garden and make the most of the space available. One took a more open-plan approach. The other created a slight sense of separation between the kitchen, dining and living areas. The options presented different approaches to concealing the stair, designing the fireplace and either concealing or exposing the television. Comparing them gave us a starting point for a richer conversation about what the clients liked and why.

Option A and Option B ground-floor plans, from the concept design presentation
Option A and Option B · Ground-floor plans
Option AOption B
Option A and Option B · Section sketches

The clients preferred Option B. They liked the cabinetry detailing, the relationship between the dining table and island bench, and the practical wall of storage beneath the stair.

03 / Design development

Design development

Developing the chosen direction through detailed layouts, materials and finishes

During design development, the initial concepts become more resolved. We introduce colour, materials and texture, and provide the clients with physical samples. We separate concept design and design development to establish the big ideas before working through the detail. This keeps the focus on the right decisions at each stage. The information builds step by step, giving the clients time to take in the ideas, ask questions and make informed decisions.

The views above show the relationship between the kitchen, dining and living areas. Full-height folding doors open towards the courtyard. Skylights over the hall and stair bring light into the deeper part of the plan.

We presented these views alongside the materials below to communicate the atmosphere of the space and how its elements work together. In this phase, our conversations become more specific. We move from the general layout to resolving the positions of the island bench, sink and oven, and the arrangement of cupboards.

The material palette: stone, textured tiles, paint, timber and brass hardware samples

When choosing materials and details, we consider how the new work will sit alongside the existing house. Old windows, uneven walls and the occasional awkward junction tell part of its story. If we make every surface square, flush and uniform, we can lose some of the character we liked in the first place.

At Smethwick Cottage, we looked carefully at what needed restoring and where irregularities should remain. We explored a gradual transition between old and new through the finishes, mouldings and architectural trims. Niches, alcoves and deliberate misalignments help the new rooms feel as though they have evolved with the house. Together, these choices continue its story.

To finish this phase, we visited the showrooms with the clients to review and sign off all the selections in person. With all the rooms resolved to this level, we could then turn our attention to construction documentation.

04 / Documentation

Documentation

Preparing drawings and schedules and reviewing costs with the builder

Documentation turns the design we’ve developed with the clients into the information the builder needs to price and build it. The drawings show the layout, dimensions and construction details. Capturing this accurately reduces the risk of price overruns, miscommunication and disappointment when things aren’t built as the clients had hoped.

Documentation describes the project at different levels of detail. We work through how materials meet, how joinery is made, and how doors, trims and lights sit together. These smaller decisions shape the character of the room. Resolving and recording them takes time, but leaves fewer assumptions to be made on site. It helps carry the design we’ve developed together through to the finished home. Good detailing is a skill developed over many years of practice, and there is always more to learn.

Technical kitchen elevation showing the change in floor level
Technical drawing · Kitchen elevation and level change

The kitchen elevation shows how the joinery, doors and architraves relate to the level change and bathroom landing. It also records the positions of selected wall lights and pendants. The joinery drawings set out places for pantry supplies, coffee cups and the things used for dinner parties.

Window detail and bedroom interior view
Technical drawing · Window detail and interior view

The front-room window draws on heritage millwork and timber detailing, interpreted in our own way. You might not notice every detail, but a room that feels relaxed and full of character takes careful thought to draw and execute.

05 / Construction

Construction

Checking the building work and working through decisions on site

Our work continues once construction begins. We make regular site visits, check the work against the drawings and specifications, and work with the builder and consultants to resolve questions as they arise. We also assess payment claims and proposed changes, and keep the clients informed about time, cost and progress. Because we know the design in detail, we can consider what a proposed change means for the rooms and the clients’ priorities.

Stacked bricks and brickwork under construction at the rear of the houseGroup outside the house during construction
Brickwork and materials on site, and a site visit with the clients.

Site update · 3 November 2026

The slab is down. As the rooms take shape, we’re looking forward to testing paint samples in the actual light, alongside the other materials. We’ve spent time developing the palette. Seeing it in the house will help us check the final colours.

Continue exploring

More from the studio

Projects

Explore our residential projects, from early design studies to homes in construction and built work.

Working together

Our services

Explore our services and the fixed-fee Discovery first step.

View all projects
Grove Studio
Search Grove Studio
Contact

Let’s talk about
your home.

Grove Studio
Architecture & interiors

15 Aberdeen Rd
Prahran, Melbourne

[email protected]

Email opens in your own email app.